Platform Strategy (template + worked outline)

The vision + an executable roadmap. Concepts: ../WARMUP.md Ch. 2, 6. Fill in / adapt to your scenario.

Thesis

Decouple software from hardware (the JD's mandate). The HAL (Phase 09) is the spine; vendor lock-in is the enemy; the market is (a) customers wanting freedom from NVIDIA lock-in and lower cost, and (b) sovereign/regulated customers who need on-prem/air-gapped deployment. The moat is a performant, versioned, conformance-gated, multi-vendor HAL with an OEM ecosystem.

Roadmap (sequenced bets, each with a commercial outcome)

PhaseTechnicalCommercial outcomeKill criteria
0–6 moHAL + NVIDIA backend + serving (P07) + offline licensing (P11)first sovereign customer in productionno sovereign pipeline by mo 6
6–12 moAMD backend + conformance suite (P09) + observability/release (P10)OEM #1 certified; multi-vendor proofAMD backend < 80% of vendor peak
12–18 moTriton/MLIR backend + GPU sharing tiers (P06) + attestation (P11)multi-vendor GA; tiered pricing; regulated-market expansionkernel-velocity not improving

Each milestone is commercial, not just technical. Dependencies are explicit (licensing before sovereign customer; conformance before OEM).

Build vs buy (stated once, defended consistently — Phase 09 ADR)

  • Build: the HAL + control plane (the moat).
  • Adopt: kernel compiler (Triton/MLIR), inference engines, observability stack.
  • Buy: commodity infra, HSM/KMS.

Governance

  • Pace governed by error budgets (P10), not just ambition.
  • Each major investment carries a commercial thesis (P12 Ch. 6).
  • Conformance (P09 Ch. 7) gates every backend; ABI versioning (P09 Ch. 6) gates releases.

Your additions

  • The specific first customer/segment and why:
  • The riskiest bet and how you'd de-risk it (a hands-on prototype, P12 Ch. 9):
  • What you'd cut if you had half the team: