Cheatsheet 17 — Production Readiness

The pre-launch checklist for an LLM system. Full: Phase 7.10, Phase 14.

Reliability

  • Fallbacks across providers/models; retries with backoff; circuit breakers (7.07).
  • Timeouts on every call; graceful degradation.
  • Rate limits / quotas per user/tenant (noisy-neighbor) (14.04).
  • Load-tested; p95/p99 under load within target (12.06).
  • SLA defined; status page; DR/BCP.

Cost

  • Cost instrumented per request/task/user (15.05).
  • Spend caps + alerts; per-tenant budgets (7.09).
  • Caching (prompt/prefix/response) where applicable (7.05).
  • Routing (cheapest model that meets quality) (8.05).
  • Gross margin known and positive.

Quality

  • Golden eval set + harness; CI regression gate (12.08).
  • Metric per task; retrieval vs generation split for RAG.
  • Output validation (schema/grounding) (10.02, 9.08).

Observability

  • Traces with correlation IDs across retrieval→model→tools (10.08).
  • Latency (p50/p95/p99), cost, error rate dashboards (7.08).
  • Audit logs (PII-safe, tamper-evident) (14.06).
  • Alerting on anomalies, spend spikes, error spikes.

Security & privacy (Phase 14)

  • Trust boundary — model proposes, app executes (14.01, 10.05).
  • No secrets in prompts/weights/client/logs; vaulted + scoped + capped keys (14.03).
  • Tenant isolation incl. vector index/cache/fine-tunes; leak tests (14.04).
  • Guardrails in+out, fail closed; moderation; PII scrubbing (14.05, 14.02).
  • Prompt-injection red-team done (direct/indirect/exfil) (14.01).
  • Data: retention TTLs, erasure flow, provider DPA/no-train/ZDR (14.02).

Ops

  • Runbook (incidents, rollback, on-call) (7.10).
  • Versioned prompts/models; canary/rollback for changes.
  • Incident-response plan; postmortems.

The 8 numbers to know before launch

p95 latency · cost per resolved task · gross margin · golden-set eval score · error/fallback rate · violation rate (safety) · cache hit rate · throughput (req/s).


Next: 18 — Startup Unit Economics · Full: Phase 7.10